Slow and steady its coming together, superboss grills test fitted after a little fettle to the fog light holes to get them to sit in as best as possible.
		
							
						
					Announcement
				
					Collapse
				
			
		
	
		
			
				No announcement yet.
				
			
				
	
Red 91 J Gte16V
				
					Collapse
				
			
		
	X
- 
	
	
	
		
	
	
		
		
		
		
		
		
		
	
	
 Rear wheel tubs buzzed down ready for paint, all 4 inner wheel arch's are going to be stripped and buzzed down again and prepped for some Upol Gravitex and then painted same colour as the car, the previous sealer had to be removed when the rear tubs was turreted and the front arch's the sealer was damaged due to the front end being stitch welded for strengthing.You do not have permission to view this gallery.
 This gallery has 3 photos.Last edited by G.TERI.E; 07-03-2024, 05:27 AM.
 Comment
- 
	
	
	
		
	
	
		
		
		
		
		
		
		
	
	
 We have primer, its a little pink ♂️, will be left for a few days before blocking down and preparing for some colour.
 Comment
- 
	
	
	
		
	
	
		
		
		
		
		
		
		
	
	
 Inner arch's sealed and primed, paint has arrived, car is prepped and hopefully will be in paint very soon.
 - Likes 1
 Comment
- 
	
	
	
		
	
	
		
		
		
		
		
		
		
	
	
 Updates fresh flame red in da house.Attached Files- IMG-20250619-WA0002.jpg (184.0 KB, 12 views)
- IMG-20250620-WA0001~2.jpg (287.4 KB, 12 views)
- IMG-20250619-WA0003.jpg (373.1 KB, 12 views)
- IMG-20250620-WA0007~2.jpg (319.3 KB, 12 views)
- IMG-20250620-WA0004.jpg (344.3 KB, 12 views)
- IMG-20250619-WA0007.jpg (429.8 KB, 12 views)
- IMG-20250619-WA0005.jpg (352.1 KB, 12 views)
 
 Comment


Comment